9 Construction Steps of External Wall System

Views: 146     Author: Maggie Wang     Publish Time: 2017-08-21      Origin: Site

First, check the grassroots level
After paint the wall of grassroots level, the outer surface should meet the following requirements:
1) dry and clean.
2) remove the bulge, empty part of the pine loose parts.
3) the surface may not have powder and peeling phenomenon.

Second, the bears separation
It should be set to vertical and horizontal line for the flat reference, according to the design layout of the separation program, pop up installation control line of each board. 

Third, bore a hole to embedded expansion bolts
Segmented line play well, check correct, in accordance with the good split hole drilling embedded embedded expansion bolts. 

Fourth, pre-installed anchor
The connection between the L-type anchor and the H-type pendant is secured to the wall by means of expansion bolts.

Fifth, the preparation of adhesive mortar
Proportionally formulated, good adhesion mortar should be used within 1.5 hours. The bonding area of insulation decorative board should not be less than 50%, adhesive distribution point use "point box method."
 
Six, bonding + anchoring
The outer side and the inside of the H-type pendant are respectively inserted in the side groove of insulation decorative board, it through the expansion bolt and the adhesive mortar fixed to the wall.
 
Seven, fill the foam, paste the masking tape
Fill the foam strip in the divider and paste the tape on both sides of the seam.
 
Eight, fill the silicone sealant
Squeeze the silicone sealant into the slit, the process of squeeze, the mouth should be inserted into the gap above 4mm, even slow moving.
 
 Nine, tear the masking tape, protective film
After silicone sealant neat scraping, and then stripped the masking tape, the protective film is strictly prohibited to tear before all the unfinished project, If the film is covered, it should be removed at the same time remove the scaffolding.

BRD energy-saving building materials experts will personally customize for you One-stop solutions!
More information, inquiry now!

PRODUCTS

QUICK LINK

RELATED SITES

CONTACT US
  WhatsApp/Mobile: +86 18638188782    
INQUIRY

COPYRIGHT © 1995-2024 BRDECO GROUP All RIGHTS RESERVED